Language suggestion

It looks like your preferred language is:

09120000000

CNC pitch error & backlash compensation via laser tracker

0 0 10 0 0.0

Pitch error measured over full axis travel with Renishaw XL-80 Laser Interferometer; Pitch Error Compensation (PEC) table calculated at 1 mm intervals; PEC table entered in Fanuc/Siemens; backlash measured separately for positive and negative direction; post-application re-verification with laser.

WhatsApp consultation
Estimated lead time (days)
14
Warranty (days)
180
From
$7.25
Pitch error measured over full axis travel with Renishaw XL-80 Laser Interferometer; Pitch Error Compensation (PEC) table calculated at 1 mm intervals; PEC table entered in Fanuc/Siemens; backlash measured separately for positive and negative direction; post-application re-verification with laser.
  • PDF